* Arcelor Mittal Burns Harbor – 2017 – Coke Oven Battery No 2 Top Deck Repair Engineering

* United States Steel Corp ET Works – 2017 – No. 32 Stove Grouting

* Nucor Steel Louisiana LLC – 2017 – External Insulation Repairs, onsite inspection and Evaluations

* Compania Siderurgica Nacional – 2017 – Graphite Shapes Refractory Material Supply and No. 3 Campaign Extension to 2021

* Nucor Steel Louisiana LLC – 2016 – DRI Reactor Lining Assessment

* Ajax Tocco – 2016 – Refractory Lining Inspection for Casting Operation

* Arcelor Mittal Las Truchas (Mexico) – 2016 – Blast Furnace Taphole Refractory Repair and Salamander Tap Engineering, Material and Equipment Supply and Onsite advisory services.

* Compania Siderurgica Nacional – 2016 – Blast Furnace Taphole Refractory Repair Engineering and Supply

* Nucor Steel Louisiana LLC – 2015 – Refractory Engineering and Onsite Installation Advisory Services Reactor Vessel and Manifold Inspections / repair.

* Engineering Design & Testing Corporation – 2015 – Insurance

* Arcelor Mittal Burns Harbor – 2015 – Refractory Engineering and Brick Inspection for Hot Blast Stove C/D

* Ward Greenberg Heller & Reidy LLP – 2015 – Refractory Technical Assistance with United Conveyor Corp. incident

* Arcelor Mittal Indiana Harbor – 2014 – No. 7 Onsite Inspection and Advisory services

* Arcelor Mittal Burns Harbor – 2014 – No. 1 Coke Oven Battery As-Built Drawings

* Arcelor Mittal Burns Harbor – 2014 – Blast Furnace C Gas Cleaning Repairs – Venturi Lining Engineering

* Arcelor Mittal Burns Harbor – 2014 – 4C Stove Onsite Refractory Installation Inspection

* Compania Siderurgica Nacional – 2014 – Salamander Tap Repairs – Taphole 1,2,3 and 4 Core and Plug Repairs – Installation

* AK Steel Corporation 2014 – Ashland Works – Expansion Joint Engineering and Supply

* US Steel Canada, Lake Erie Works – 2013 Engineering and Inspection Blast Furnace Refractories

* Arcelor Mittal Burns Harbor 2013  – 1C Stove and Coke Oven Battery Top repairs and inspection

* Ternium Siderar 2012 Emergency Breakout Repair Advisory Services

* U.S. Steel Kosice, s.r.o 2012 Onsite Advisory Services for Grouting Blast Fce 2 Stove 24 (Slovakia)

* Arcelor Mittal Burns Harbor 2012 4C Stove Repair and Inspection

* RG Steel Sparrows Point 2012 Grouting of Stove Refractories Blast Furnace L Hot Blast Stove

* Zurich Insurance 2012 Consulting 

* Arcelor Mittal Inland 7 2012 -Salamander Tap Engineering
* USS Serbia No.1-2011-Hot Blast Main Repair Engineering and Site Supervision
* Arcelor Mittal Burns Harbor C&D-2010-Stove 1C and 4D Refractory Assessment
* USS Fairfield No.8-2011- Taphole RepairsCSN No.3 Furnace-2011-Hearth Reline Design Engineering
* Arcelor Mittal D4 Stove-2011-Stove Refractory Repair Engineering and Site Supervision* USS ET Works BF No.1-2010-Taphole Repair.
* USS Gary 14 -2010-Onsite Installation Inspection for Hearth Refractory Installation
* USS Nanticoke Works BF No.1-2010-Hearth and Stove Repairs Engineering and Onsite Installation Inspection.

* USS Great Lakes D Furnace-2009-Hearth and Bosh Repair* CSN No.3 Furnace-2009-Taphole Repairs

* USS Gary 6 Furnace-2008- Taphole and Bosh Repair

* AK Steel Corporation 2008 Middletown Works No. 3 Taphole Repairs, Hot Blast Main and Bustle Pipe Repairs, Tuyere Deck Protection Tiles, External Tuyere Surround Repairs, Shell Cold Cutting Services

* AK Steel Corporation 2008 Ashland Works Hearth Grouting Amanda Blast Furnace

* Arcelor Miittal Sparrows Point 2008 Sparrows Point Burner Redesign

* Arcelor Mittal Sparrows Point 2008 Sparrows Point Qualifying Chinese Refractory Supply for Blast Furnace L

* Arcelor Mittal Burns Harbor 2008 Burns Harbor Refractory Brick Inspection for Blast Furnace D

* Arcelor Mittal Burns Harbor 2008 Burns Harbor Hot Blast Stove Outlet Redesign

* Arcelor Mittal Burns Harbor 2008 Burns Harbor Refractory Brick Testing

* Arcelor Mittal Burns Harbor 2008 Burns Harbor Hot Blast Stove Outlet Redesign

* United States Steel Corporation 2008 Gary Works – Bosh Repairs

* Compania Siderurgica Nacional 2008 Emergency Repairs at Alto Forno 3 Volta Redonda Brazil

* United States Steel Corporation 2007 Granite City – Taphole Repairs Blast Furnace A

* AK Steel Corporation 2007 Ashland Works Tuyere Surround Repairs Amanda Blast Furnace

* AK Steel Corporation 2007 Middletown Works Study Engineering for 2007 Outage Refractory Repairs Blast Furnace No.3

* AK Steel Corporation 2007 Middletown Works Engineering and Supply Materials for Tapholes on Blast Furnace No.3

* AK Steel Corporation 2007 Middletown Works Hearth Refractory Core Drilling

* Mittal Steel Corporation 2007 Burns Harbor C Furnace Brick Inspection

* Mittal Steel Corporation 2007 Burns Harbor Purchase of Stove Refractory

* Severstal North America Inc. 2007 Blast Furnace B Stack Repairs

* Severstal North America Inc. 2007 Blast Furnace B Refractory Brick Supply

* United States Steel Corporation 2007 Gary Works Hearth Refractory Campaign Extension Blast Furnace No.14

* United States Steel Corporation 2007 Granite City Blast Furnace A Trough Condition Assessment

* AK Steel Corporation 2006 Middletown Works Hot Blast Main Repairs to Refractories for Blast Furnace No.3

* AK Steel Corporation 2006 Ashland Works Engineering and Supply for Expansion Joint of Amanda Hot Blast Outlet

* AK Steel Corporation 2006 Ashland Works Hot Blast Stove Repairs Refractories

* AK Steel Corporation 2006 Ashland Works Hearth Refractory and Core Drilling

* Algoma Steel Inc. 2006 Development of the Taphole Repair Senerios

* Companhia Siderurgica Nacional 2006 Hearth Wall Campaign Extension Alto Forno No.2

* Companhia Siderurgica Nacional 2006 Refractory Supply for Graphite Coolers for Hearth Wall Campaign Extension

* Mittal Steel Corporation 2006 Burns Harbor Refractory Brick Inspection at Vesuvius for 2C Stove

* Mittal Steel Corporation 2006 Burns Harbor Refractory Brick Inspection at BNZ for 2C Stove

* Mittal Steel Corporation 2006 Cleveland Stove No.52 and 53 Condition Assessment

* Mittal Steel Corporation 2006 Cleveland Stove No.51 Condition Assessment

* Mittal Steel Corporation 2006 Sparrows Point Inspection of Stove 32 Burner, Refractory Installation and Repairs

* Mittal Steel Corporation 2006 Sparrows Point Stove No.2 Burner Refractory inspection and Blast Furnace L Repairs

* Mittal Steel Corporation 2006 Sparrows Point Blast Furnace L Stove No.3 Repair

* Mittal Steel Corporation 2006 Sparrows Point Installation of LTS Safety Partitions between East and West Stations

* Mittal Steel Corporation 2006 Sparrows Point Assistance with Grouting of Stove Refractories

* Mittal Steel Corporation 2006 Sparrows Point Grouting of Stove Refractories

* Severstal North America Inc. 2006 Hearth Refractory Core Drill

* Severstal North America Inc. 2006 C Furnace Tuyere Surround Repair

* Severstal North America Inc. 2006 Service, Core Drill, Analysis and Report Hearth Condition

* Severstal North America Inc. 2006 Hearth / Stack Refractory Lining Campaign Extension, Blast Furnace C

* Stelco Hamilton Steel GP Inc. 2006 Assessment of Hearth Refractory Condition

* Stelco Hamilton Steel GP Inc. 2006 Hearth and Tuyere Refractory Study for Blast Furnace E

* Stelco Hamilton Steel GP Inc. 2006 Hearth and Tuyere Refractory Supply for Blast Furnace E

* United States Steel Corporation 2006 Fairfield Works Engineering and Supply for Expansion Joint of Hot Blast Outlet

* United States Steel Corporation 2006 Fairfield Works Complete Refractory Lining for Expansion Joints of Hot Blast Outlet

* United States Steel Corporation 2006 Fairfield Works Field Installation of Refractories for Two Hot Blast Expansion Joints

* AK Steel Corporation Middletown Works 2005 Assistance with Hot Blast Main Design – Refractory

* AK Steel Corporation Ashland Works 2005 Engineering and Supply for Hot Blast Stove Repairs Amanda

* AK Steel Corporation Ashland Works 2005 Hot Blast Stove Refractory Repairs Amanda

* AK Steel Corporation Ashland Works 2005 – Technical Assistance with Hearth Refractories Amanda

* GE Energy USA LLC 2005 Refractory Design Package for the Wison CO and Methanol Project

* Mittal Steel Corporation 2005 Burns Harbor Supply Materials to the Repair of Blast furnace D East Taphole

* Mittal Steel Corporation 2005 Burns Harbor Installation Advisory, Asbuilts and Report for Repair of Taphole Blast Furnace D

* Mittal Steel Corporation 2005 Sparrows Point Assistance with Grouting of Hot Spots on Blast Furnace L Stoves

* Mittal Steel Corporation 2005 Sparrows Point Blast Furnace L No. 2 Stove Rebuild

* Mittal Steel Corporation 2005 Sparrows Point Assistance with Core Drill and Wear Rods

* Mittal Steel Corporation 2005 Sparrows Point Blast Furnace L Stove No.2 Rebuild

* Mittal Steel Corporation 2005 Sparrows Point Replace Checker Refractory and Repairs on Blast Furnace L No.2 Stove

* Mittal Steel Corporation 2005 Sparrows Point Repairs to Taphole No.1 Refractories for Blast Furnace L May 2005 Outage

* Mittal Steel Corporation 2005 Sparrows Point Repairs to Stove No.3 Refractories for Blast Furnace L 2006 Outage

* Mittal Steel Corporation 2005 Sparrows Point Repairs to Taphole No.2 and No.4 Refractories for Blast Furnace L

* Mittal Steel Corporation 2005 Weirton Stove and Hot Blast Main Refractories for Blast Furnace No.1

* United States Steel Corporation 2005 Edgar Thomson Plant Universal Hearth Refractory

* United States Steel Corporation 2005 Fairfield Works Engineering and Supply for Expansion Joint and Refractory Lining for Blast Furnace No.8

* United States Steel Corporation 2005 Edgar Thomson Plant Blast Furnace No.1 Taphole Refractory Evaluation

* United States Steel Corporation 2005 Edgar Thomson Plant Blast Furnace No.3 Taphole Refractory Evaluation

* United States Steel Corporation 2005 Gary Works Technical Assistance with Gary No.13 Hearth Wall Refractory Assessment

* WCI Steel Inc. 2005 Stove No.3 Refractory Engineering

* WCI Steel Inc. – 2005 Inspection Assistance with Stove Refractories

* WCI Steel Inc. 2005 Field Refractory Inspection Services During Refractory Installation

* AK Steel Corporation -2004 Refractory Assessment for Blast Furnace No.3

* AK Steel Corporation -2004 Repair Refractory Lining of Dome Rayotube Opening on Stove No.1

* AK Steel Corporation -2004 Inspection Assistance with Stove Refractories for Blast Furnace No.3

* GE Energy -2004 Gasifier Refractory Linings Shaanxi Shenmu Refractory Lining Design

* GE Energy -2004 Gasifier Refractory Linings NCIC Refractory Lining Design

* Mittal Steel Corporation -2004 Burns Harbor D Furnace East Taphole Engineering

* Mittal Steel Corporation -2004 Sparrows Point Replacement of Taphole Refractories for Blast Furnace L

* Mittal Steel Corporation -2004 Sparrows Point Inspection Services during Demolition and Installation of Refractories

* Severstal North America Inc. -2004 B1 Stove Refractories for Blast Furnace B

* United States Steel Corporation -2004 Hearth Refractory Analysis for Blast Furnace No.13

* United States Steel Corporation -2004 Conceptual Refractory Lining Design for Blast Furnace No.13 for 2005 Outage

* United States Steel Corporation 2004 Granite City B Furnace Taphole Refractory

* National Steel Granite City Hot Blast Main 2003 Repairs. Revise expansion joint refractory and steel design.

* WCI Stove 2 2003 Reline. Update Stove Refractory Design and Specifications. *

* USS 2002 Gary 13 Blast Furnace. Analysis of hearth refractory condition.

* AK Steel 2002 Middletown No.3 Hot Blast Main Repair. Engineering and Field inspection of refractory repairs.

* BSC Refractory Supplier Qualification. Performed assessments of refractory manufacturers to determine capabilities for manufacturing stove refractories. Assisted suppliers in improving quality to specifications for dimensional and refractory properties.

* BSC 2002 Back Draft Stack Repair. Engineering and field inspection of refractory repair.

* AK Steel 2001 Amanda Taphole Refractory Repair. Field inspection of refractory repairs.

* BSC 2001 3D Hot Blast Stove Rebuild Engineering. Engineering of Hot Blast Stove refractories.

* BSC 2001 L2 Hot Blast Stove Refractory Repair Engineering.

* Royal Sun Alliance. Consultant for Refractory Repairs

* AK Steel 2000 Amanda Hot Blast Main Repair. Engineering and field inspection of refractory repairs.

* BSC 2000 C4 Stove Reline. Design review and field inspection of refractory installation

* RSC 1999 Furnace Restart. Provided design, planning and installation advisory and inspection services for refractory repairs to B and C furnaces for emergency restart after boiler house explosion.

* USS Kobe No.3 Seamless Rotary Hearth. Provided failure analysis study for 1998 repair.

* RSC 1998 Hot Blast Stove Checker Repair. Design review and field inspection of refractory installation

* RSC 1998-99 Rotary Hearth. Provided design, planning and installation advisory and inspection services.

* AK Steel Middletown No.3 1998 Taphole and Hot Blast Main Repair. Provided design, planning and installation advisory and inspection services for 17 day repair to furnace.

* RSC B Furnace 1997 Furnace Reline. Provided design, planning and installation advisory and inspection services for 70 day reline.

* RSC 1998 Torpedo Ladle Failure Analysis. Provided failure analysis and redesign of refractory systems for torpedo ladle fleet.

* AK Steel Amanda Furnace 1997 Taphole Repair. Provided design, planning and installation advisory and inspection services for 13 day repair to furnace tapholes and troughs.

* ATSI Engineering. Consultant for Refractory Design and Installation

* RSC C Furnace 1996 Reline. Provided onsite installation advisory and inspection services for 30 day repair to furnace lining.